This DHD900 pipe jacking machine for pipe OD of 1200mm is specially built with 2 different cutter disks for Aik Leong Plumbing Construction’s upcoming pipe diversion projects in Singapore, each with different ground conditions.
First, the normal cutter disk as installed on the DHD900 will be used for excavating hard soil in an LTA sewer diversion project. Upon completion, it will then be replaced with the rock cutter disk for excavating through rock conditions at Pasir Panjang Road / West Coast Drive area, as part of the Deep Tunnel Sewerage System (DTSS) Phase 2 project.
Machine inspection was done earlier in March and machine has arrived in Singapore. Pipe jacking works were delayed due to our government’s Circuit Breaker measures and will be scheduled to start only after the measures are lifted.
JK&T Equipment specialises in providing microtunneling equipment to Singapore, Malaysia and Hong Kong. Contact us at 6904 5833 or enquiries@jktgroup.com.sg for a project consultation, or visit for more information.